In a design-build project, the owner hires our company under one contract to deliver the construction project from start to finish. Since our company is responsible for both the design and construction components, pricing changes are kept to a minimum and are usually isolated to instances where unknown conditions or owner requests necessitate cost increases.

Design build is typically used for construction projects where the owner has clearly established the requirements prior to design. It can also be an appropriate method when the schedule is a concern, as it removes the components of the schedule that would typically be consumed by the bidding process.

 

Request Design-Build Bid Proposal

Design-Build: Benefits

  • Owner retains control of design
  • Construction input occurs during the design process
  • Overlaps and gaps in scope are identified during pre-construction
  • Cost-benefit of procuring the construction directly from the trades
  • Improved schedule due to early resolution of design and construction issues
  • Packaging of work can allow for construction to start early
  • Tighter control to adhere scope budget

A Few Design-Build Projects Include: 

Replace HVAC System at City Hall
200 S. Anaheim Blvd.
Anaheim, CA 92805 

Metrolink SCRRA
Train Control & Operations Support Facility
2704 North Garey Avenue
Pomona, CA 91767